{"id":118580,"date":"2025-07-22T17:03:19","date_gmt":"2025-07-22T17:03:19","guid":{"rendered":"https:\/\/chezaspin.com\/blog\/index.php\/2025\/07\/22\/section-of-nyalis-links-road-to-close-for-6-months-for-flooding-reconstruction\/"},"modified":"2025-07-22T17:03:19","modified_gmt":"2025-07-22T17:03:19","slug":"section-of-nyalis-links-road-to-close-for-6-months-for-flooding-reconstruction","status":"publish","type":"post","link":"https:\/\/chezaspin.com\/blog\/section-of-nyalis-links-road-to-close-for-6-months-for-flooding-reconstruction\/","title":{"rendered":"Section of Nyali\u2019s Links Road to close for 6 months for flooding reconstruction"},"content":{"rendered":"<p><strong>MOMBASA, Kenya, Jul 22 \u2014 The Kenya Urban Roads Authority (KURA) has announced a six-month closure of a key section of Links Road in Nyali, Mombasa County, starting Friday, August 1, 2025, at 6am.<\/strong><\/p>\n<p>The closure affecting a stretch near Nyali\u2019s Premier Hospital, which will remain in effect until Friday, January 30, 2026, at 6pm, will facilitate major reconstruction works aimed at resolving persistent flooding and drainage issues in the area.<\/p>\n<div class=\"wp-block-image\">\n<a href=\"https:\/\/www.capitalfm.co.ke\/news\/files\/2025\/07\/image-2.png\"><\/a><\/div>\n<p>KURA stated that the project will involve elevating the entire road section and constructing an enhanced drainage system to improve rainwater flow and prevent the seasonal flooding that has long disrupted transport and affected businesses and residents.<\/p>\n<p>\u201cThis road closure is necessary to facilitate the construction works with the aim of providing a lasting solution to the regular flooding and drainage challenges that usually affect this section of the road,\u201d KURA stated on Monday.<\/p>\n<p>The Authority urged motorists and other road users to avoid the affected stretch during the construction period and use alternative routes.<\/p>\n<p>KURA said traffic police and marshals will guide road users and ensure smooth traffic flow in surrounding areas.<\/p>\n<p>\u201cWe apologize for any inconvenience caused as we continue to transform urban mobility,\u201d the Authority said.<\/p>","protected":false},"excerpt":{"rendered":"<p>MOMBASA, Kenya, Jul 22 \u2014 The Kenya Urban Roads Authority (KURA) has announced a six-month closure of a key section of Links Road in Nyali, Mombasa County, starting Friday, August 1, 2025, at 6am. The closure affecting a stretch near Nyali\u2019s Premier Hospital, which will remain in effect until Friday, January 30, 2026, at 6pm, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-118580","post","type-post","status-publish","format-standard","hentry","category-uncategorized","entry"],"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/posts\/118580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/comments?post=118580"}],"version-history":[{"count":0,"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/posts\/118580\/revisions"}],"wp:attachment":[{"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/media?parent=118580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/categories?post=118580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chezaspin.com\/blog\/wp-json\/wp\/v2\/tags?post=118580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}