BRT is part of the Nairobi Integrated Urban Development Master Plan to end congestion.
KURA to build Sh7.3bn BRT line 5 on Outer Ring Road
- Post author:
- Post published:September 11, 2024
- Post category:Uncategorized
- Post comments:0 Comments
BRT is part of the Nairobi Integrated Urban Development Master Plan to end congestion.